{"id":7813,"date":"2024-12-25T10:09:35","date_gmt":"2024-12-25T02:09:35","guid":{"rendered":"https:\/\/www.continental-holdings.com\/about\/media-center\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\/"},"modified":"2024-12-30T10:10:16","modified_gmt":"2024-12-30T02:10:16","slug":"%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5","status":"publish","type":"post","link":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\/","title":{"rendered":"CEC Awarded Taipei MRT South Circular Line CF670 Project Reported a Record High Backlog to NT$130 bn"},"content":{"rendered":"<p>Continental Engineering Corporation (CEC), a subsidiary of Continental Holdings Corporation (Stock Code: 3703), has been awarded the \u201cCF670 South Circular Line Project\u201d by the Department of Rapid Transit Systems, Taipei City Government. The total contract value of this project is NT$23,205 million with a construction duration of 3,579 calendar days.<\/p>\n<p>The CF670 project spans 3.7km and encompasses the construction of four underground stations and four sections of shield tunnel totaling 3,114m, including associated Mechanical, Electrical and elevator\/escalator works. <\/p>\n<p>CEC continues to consolidate its position as an important construction partner for the Taipei City Government for construction of the north-south section of the Taipei Metro Circular Line. This new contract will take CEC forecast backlog at the end of the year to record NT$130 bn equivalent to 6 years of current revenue.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Continental Engineering Corporation (CEC), a subsidiary of Continental Holdings Corporation (Stock Code: 3703), has been awarded the \u201cCF670 South Circular Line Project\u201d by the Department of Rapid Transit Systems, Taipei City Government. The total contract value of this project is NT$23,205 million with a construction duration of 3,579 calendar days. The CF670 project spans 3.7km &hellip; <a href=\"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\/\">Continued<\/a><\/p>\n","protected":false},"author":32,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[78],"tags":[],"class_list":["post-7813","post","type-post","status-publish","format-standard","hentry","category-uncategorized-zh-2","company-cec"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CEC Awarded Taipei MRT South Circular Line CF670 Project Reported a Record High Backlog to NT$130 bn - Continental Holdings Corporation (CHC)<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/\u5927\u9678\u5de5\u7a0b\u7372\u9078\u627f\u652c\u53f0\u5317\u6377\u904b\u300c\u74b0\u72c0\u7dda\u5357\u74b0\u6bb5cf670\u5340\u6bb5\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CEC Awarded Taipei MRT South Circular Line CF670 Project Reported a Record High Backlog to NT$130 bn - Continental Holdings Corporation (CHC)\" \/>\n<meta property=\"og:description\" content=\"Continental Engineering Corporation (CEC), a subsidiary of Continental Holdings Corporation (Stock Code: 3703), has been awarded the \u201cCF670 South Circular Line Project\u201d by the Department of Rapid Transit Systems, Taipei City Government. The total contract value of this project is NT$23,205 million with a construction duration of 3,579 calendar days. The CF670 project spans 3.7km &hellip; Continued\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/\u5927\u9678\u5de5\u7a0b\u7372\u9078\u627f\u652c\u53f0\u5317\u6377\u904b\u300c\u74b0\u72c0\u7dda\u5357\u74b0\u6bb5cf670\u5340\u6bb5\/\" \/>\n<meta property=\"og:site_name\" content=\"Continental Holdings Corporation (CHC)\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-25T02:09:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-30T02:10:16+00:00\" \/>\n<meta name=\"author\" content=\"Jem\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jem\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/about\\\/media-center\\\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/about\\\/media-center\\\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\\\/\"},\"author\":{\"name\":\"Jem\",\"@id\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/#\\\/schema\\\/person\\\/c4ae101edab3e0358f673bf875ff591d\"},\"headline\":\"CEC Awarded Taipei MRT South Circular Line CF670 Project Reported a Record High Backlog to NT$130 bn\",\"datePublished\":\"2024-12-25T02:09:35+00:00\",\"dateModified\":\"2024-12-30T02:10:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/about\\\/media-center\\\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\\\/\"},\"wordCount\":146,\"articleSection\":[\"Uncategorized @zh\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/about\\\/media-center\\\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\\\/\",\"url\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/about\\\/media-center\\\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\\\/\",\"name\":\"CEC Awarded Taipei MRT South Circular Line CF670 Project Reported a Record High Backlog to NT$130 bn - Continental Holdings Corporation (CHC)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/#website\"},\"datePublished\":\"2024-12-25T02:09:35+00:00\",\"dateModified\":\"2024-12-30T02:10:16+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/#\\\/schema\\\/person\\\/c4ae101edab3e0358f673bf875ff591d\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/about\\\/media-center\\\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/about\\\/media-center\\\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/about\\\/media-center\\\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.continental-holdings.com\\\/zh\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CEC Awarded Taipei MRT South Circular Line CF670 Project Reported a Record High Backlog to NT$130 bn\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/\",\"name\":\"Continental Holdings Corporation (CHC)\",\"description\":\"Continental Holdings Corporation (CHC) has an investment portfolio covering three business sectors: Civil &amp; Building Construction, Real Estate Development, and Environmental Project Development.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/#\\\/schema\\\/person\\\/c4ae101edab3e0358f673bf875ff591d\",\"name\":\"Jem\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3976456b41c69b1b8efa3ea20aebc4d71d0a7feb9583dbf52bbf8334900612aa?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3976456b41c69b1b8efa3ea20aebc4d71d0a7feb9583dbf52bbf8334900612aa?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3976456b41c69b1b8efa3ea20aebc4d71d0a7feb9583dbf52bbf8334900612aa?s=96&d=mm&r=g\",\"caption\":\"Jem\"},\"url\":\"https:\\\/\\\/www.continental-holdings.com\\\/en\\\/about\\\/media-center\\\/author\\\/jem\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CEC Awarded Taipei MRT South Circular Line CF670 Project Reported a Record High Backlog to NT$130 bn - Continental Holdings Corporation (CHC)","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/\u5927\u9678\u5de5\u7a0b\u7372\u9078\u627f\u652c\u53f0\u5317\u6377\u904b\u300c\u74b0\u72c0\u7dda\u5357\u74b0\u6bb5cf670\u5340\u6bb5\/","og_locale":"en_US","og_type":"article","og_title":"CEC Awarded Taipei MRT South Circular Line CF670 Project Reported a Record High Backlog to NT$130 bn - Continental Holdings Corporation (CHC)","og_description":"Continental Engineering Corporation (CEC), a subsidiary of Continental Holdings Corporation (Stock Code: 3703), has been awarded the \u201cCF670 South Circular Line Project\u201d by the Department of Rapid Transit Systems, Taipei City Government. The total contract value of this project is NT$23,205 million with a construction duration of 3,579 calendar days. The CF670 project spans 3.7km &hellip; Continued","og_url":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/\u5927\u9678\u5de5\u7a0b\u7372\u9078\u627f\u652c\u53f0\u5317\u6377\u904b\u300c\u74b0\u72c0\u7dda\u5357\u74b0\u6bb5cf670\u5340\u6bb5\/","og_site_name":"Continental Holdings Corporation (CHC)","article_published_time":"2024-12-25T02:09:35+00:00","article_modified_time":"2024-12-30T02:10:16+00:00","author":"Jem","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jem","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\/#article","isPartOf":{"@id":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\/"},"author":{"name":"Jem","@id":"https:\/\/www.continental-holdings.com\/en\/#\/schema\/person\/c4ae101edab3e0358f673bf875ff591d"},"headline":"CEC Awarded Taipei MRT South Circular Line CF670 Project Reported a Record High Backlog to NT$130 bn","datePublished":"2024-12-25T02:09:35+00:00","dateModified":"2024-12-30T02:10:16+00:00","mainEntityOfPage":{"@id":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\/"},"wordCount":146,"articleSection":["Uncategorized @zh"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\/","url":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\/","name":"CEC Awarded Taipei MRT South Circular Line CF670 Project Reported a Record High Backlog to NT$130 bn - Continental Holdings Corporation (CHC)","isPartOf":{"@id":"https:\/\/www.continental-holdings.com\/en\/#website"},"datePublished":"2024-12-25T02:09:35+00:00","dateModified":"2024-12-30T02:10:16+00:00","author":{"@id":"https:\/\/www.continental-holdings.com\/en\/#\/schema\/person\/c4ae101edab3e0358f673bf875ff591d"},"breadcrumb":{"@id":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e5%a4%a7%e9%99%b8%e5%b7%a5%e7%a8%8b%e7%8d%b2%e9%81%b8%e6%89%bf%e6%94%ac%e5%8f%b0%e5%8c%97%e6%8d%b7%e9%81%8b%e3%80%8c%e7%92%b0%e7%8b%80%e7%b7%9a%e5%8d%97%e7%92%b0%e6%ae%b5cf670%e5%8d%80%e6%ae%b5\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.continental-holdings.com\/zh\/"},{"@type":"ListItem","position":2,"name":"CEC Awarded Taipei MRT South Circular Line CF670 Project Reported a Record High Backlog to NT$130 bn"}]},{"@type":"WebSite","@id":"https:\/\/www.continental-holdings.com\/en\/#website","url":"https:\/\/www.continental-holdings.com\/en\/","name":"Continental Holdings Corporation (CHC)","description":"Continental Holdings Corporation (CHC) has an investment portfolio covering three business sectors: Civil &amp; Building Construction, Real Estate Development, and Environmental Project Development.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.continental-holdings.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.continental-holdings.com\/en\/#\/schema\/person\/c4ae101edab3e0358f673bf875ff591d","name":"Jem","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/3976456b41c69b1b8efa3ea20aebc4d71d0a7feb9583dbf52bbf8334900612aa?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3976456b41c69b1b8efa3ea20aebc4d71d0a7feb9583dbf52bbf8334900612aa?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3976456b41c69b1b8efa3ea20aebc4d71d0a7feb9583dbf52bbf8334900612aa?s=96&d=mm&r=g","caption":"Jem"},"url":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/author\/jem\/"}]}},"_links":{"self":[{"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/posts\/7813","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/users\/32"}],"replies":[{"embeddable":true,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/comments?post=7813"}],"version-history":[{"count":1,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/posts\/7813\/revisions"}],"predecessor-version":[{"id":7814,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/posts\/7813\/revisions\/7814"}],"wp:attachment":[{"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/media?parent=7813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/categories?post=7813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/tags?post=7813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}