{"id":1163,"date":"2018-08-29T03:05:11","date_gmt":"2018-08-29T03:05:11","guid":{"rendered":"https:\/\/continental-holdings.com\/?p=1163"},"modified":"2020-11-20T17:35:59","modified_gmt":"2020-11-20T09:35:59","slug":"%e6%ac%a3%e9%81%94%e7%92%b0%e5%b7%a5%e7%8d%b2%e8%87%a8%e6%b5%b7%e6%b1%a1%e6%b0%b4%e5%bb%a0%e6%9a%a8%e6%94%be%e6%b5%81%e6%b0%b4%e5%9b%9e%e6%94%b6%e5%86%8d%e5%88%a9%e7%94%a8bto%e8%a8%88%e7%95%ab","status":"publish","type":"post","link":"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e6%ac%a3%e9%81%94%e7%92%b0%e5%b7%a5%e7%8d%b2%e8%87%a8%e6%b5%b7%e6%b1%a1%e6%b0%b4%e5%bb%a0%e6%9a%a8%e6%94%be%e6%b5%81%e6%b0%b4%e5%9b%9e%e6%94%b6%e5%86%8d%e5%88%a9%e7%94%a8bto%e8%a8%88%e7%95%ab\/","title":{"rendered":"HEC awarded BTO Project of Linhai Sewage Treatment Plant and Reclaimed Water"},"content":{"rendered":"<p>Hsin Dar Environment Corporation (HEC) has been awarded Kaohsiung City\u2019s \u201cBTO Project of LinHai Sewage Treatment Plant and Reclaimed Water\u201d.\u00a0 This is another large-scale BTO project in the reclaimed water sector for HEC since 2016.<\/p>\n<p>The project, won by a joint venture led by HEC (55%) together with CTCI (45%), has a total construction value of USD $131 million (TWD$ 4.03 billion). Scope of the work includes construction of a sewage treatment plant (capacity: 55,000 CMD\/per day), a reclaimed water treatment plant (capacity: 33,000 CMD\/per day), a wastewater laboratory building, and installation of 9.7 km of pipelines for intake and distribution system.<\/p>\n<p>A concession entity will be set up for construction beginning in November with operations expected to commence in 2021. The concession period will span eighteen years until 2036.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hsin Dar Environment Corporation (HEC) has been awarded Kaohsiung City\u2019s \u201cBTO Project of LinHai Sewage Treatment Plant and Reclaimed Water\u201d.\u00a0 This is another large-scale BTO project in the reclaimed water sector for HEC since 2016. The project, won by a joint venture led by HEC (55%) together with CTCI (45%), has a total construction value &hellip; <a href=\"https:\/\/www.continental-holdings.com\/en\/about\/media-center\/%e6%ac%a3%e9%81%94%e7%92%b0%e5%b7%a5%e7%8d%b2%e8%87%a8%e6%b5%b7%e6%b1%a1%e6%b0%b4%e5%bb%a0%e6%9a%a8%e6%94%be%e6%b5%81%e6%b0%b4%e5%9b%9e%e6%94%b6%e5%86%8d%e5%88%a9%e7%94%a8bto%e8%a8%88%e7%95%ab\/\">Continued<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[78],"tags":[],"_links":{"self":[{"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/posts\/1163"}],"collection":[{"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/comments?post=1163"}],"version-history":[{"count":3,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/posts\/1163\/revisions"}],"predecessor-version":[{"id":4226,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/posts\/1163\/revisions\/4226"}],"wp:attachment":[{"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/media?parent=1163"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/categories?post=1163"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.continental-holdings.com\/en\/wp-json\/wp\/v2\/tags?post=1163"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}